Loads, equipment selection, and duct design for tenant fit-outs, small offices, and shops, prepared by a licensed PE and quoted at a fixed fee.
Zone-by-zone heating and cooling loads, with ventilation air, per ACCA Manual N.
Loads plus equipment selection verified against manufacturer performance data.
Loads, equipment selection, and duct design, coordinated as one deliverable.
Everything in the HVAC Design Package plus COMcheck energy code compliance.
Building use, size, and drawings. Five minutes.
Scope, fee, and delivery date by email within 2 business days.
Accept the terms and pay by card or bank transfer. Work starts on payment.
A branded PDF report, ready for permit, on the date in your quote.
| Deliverable | Load Calc | Load & Equip. | HVAC Design | Permit |
|---|---|---|---|---|
| PDF report prepared and reviewed by a licensed Mechanical PE | ✓ | ✓ | ✓ | ✓ |
| Zone-by-zone heating and cooling loads (sensible and latent) | ✓ | ✓ | ✓ | ✓ |
| Ventilation air, occupancy, lighting, and equipment loads documented | ✓ | ✓ | ✓ | ✓ |
| Manual CS equipment selection (capacity verified at design conditions) | ✓ | ✓ | ✓ | |
| Manual Q duct sizing worksheet and airflow schedule | ✓ | ✓ | ||
| Duct layout marked on your floor plan (CAD duct drawings quoted separately) | ✓ | ✓ | ||
| COMcheck energy code compliance report | ✓ |
PE-prepared PDF report. Zone-by-zone heating and cooling loads. Ventilation air, occupancy, lighting, and equipment loads documented.
Everything in the Load Calculation, plus Manual CS equipment selection with capacity verified at design conditions.
Everything in Load & Equipment Sizing, plus the Manual Q duct sizing worksheet, airflow schedule, and duct layout marked on your floor plan.
Everything in the HVAC Design Package, plus the COMcheck energy code compliance report.
Send your drawings and project details. Receive a clear scope, fee, and schedule within 2 business days.